Biggest Working Bee Since Old Canteen Demolition

The track will be closed between September 17 – 20 2015 for a working bee to replace the sand traps with gravel.

The “GRAND PLAN” is to:

  1. Dig out the existing sand traps, lay weed mat in the traps, level the edges of the track, fill traps with gravel.
  2. Remove existing tyre bundles and level the areas and replace with V8 Supercar tyres.

Let’s all pitch in to get this done and get the track reopened as soon as possible.

A BBQ lunch will be provided on Saturday & Sunday.